”E. Mestica” School Complex
”E. Mestica” School Complex
”E. Mestica” School Complex

Home > Progetti > Education > ”E. Mestica” School Complex

Works

”E. Mestica” School Complex

”E. Mestica” School Complex

An integrated project as a response to the emergency

Location
Macerata, Italy
Typology
Education
Year
2018
Status
Completed
Dimensions
5.100 sqm
Client
Gualtieri Costruzioni - Albertani Corporates - Califel
Activities
AR – ST – MEP design
Credits
Photos: Andrea Zanchi

Description

Speed, effectiveness and efficiency are the traits that should define an operation in emergency contexts.
These are the fundamental characteristics of the “E. Mestica” Educational Centre in Macerata, built to replace the pre-existing school, damaged during the 2016 earthquake.

The BIM-oriented approach led to the optimisation of all processes and disciplines according to an integrated method, capable of combining quality and tight deadlines. The employed prefabricated construction methods, including the use of wood, are fundamental to the anti-seismic performance of the structure, and generally positively affect the quality of the interior spaces.

”E. Mestica” School Complex

Focus

Fast construction times and high anti-seismic performance for the Macerata school complex, rebuilt after the 2016 earthquake.